REF | Available properties | Bedrooms | Bathrooms | Built Area | Price | Floor plan |
---|---|---|---|---|---|---|
2066 |
7th Floor - Door 3, Residencial La Calcinera
|
3
|
2
|
107m2
|
490.000€
|
|
2065 |
4th Floor - Door 4, Residencial La Calcinera
|
3
|
2
|
107m2
|
445.000€
|
|
2135 |
Ground Floor - Door 1, Residencial La Calcinera
|
2
|
2
|
186m2
|
435.000€
|
|
2136 |
Ground Floor - Door 4, Residencial La Calcinera
|
3
|
2
|
156m2
|
510.000€
|
|
2137 |
Ground Floor - Door 7, Residencial La Calcinera
|
2
|
2
|
178m2
|
415.000€
|
|
2138 |
Ground Floor - Door 8, Residencial La Calcinera
|
3
|
2
|
208m2
|
555.000€
|
|
2139 |
1st Floor - Door 8, Residencial La Calcinera
|
3
|
2
|
107m2
|
420.000€
|
|
2140 |
2nd Floor - Door 4, Residencial La Calcinera
|
3
|
2
|
107m2
|
425.000€
|
|
2141 |
3rd Floor - Door 4, Residencial La Calcinera
|
3
|
2
|
107m2
|
435.000€
|
|
2142 |
5th Floor - Door 4, Residencial La Calcinera
|
3
|
2
|
107m2
|
455.000€
|
|
2143 |
5th Floor - Door 6, Residencial La Calcinera
|
1
|
1
|
50m2
|
260.000€
|
|
2144 |
6th Floor - Door 3, Residencial La Calcinera
|
3
|
2
|
107m2
|
460.000€
|
|
2145 |
8th Floor - Door 2, Residencial La Calcinera
|
3
|
2
|
140m2
|
630.000€
|
|
2146 |
8th Floor - Door 3, Residencial La Calcinera
|
3
|
2
|
167m2
|
750.000€
|
La Calcinera is located in the very centre of Encamp, within walking distance of all services. The centre of Encamp has gradually been transformed over the last decade, with new parks and other facilities that now make it a very attractive proposition for living in and for investment.
The development consists of 10 floors with a total of 80 apartments and a common area designated for parking. The apartments can have 1, 2, 3, and 4 bedrooms with sizes ranging from 47 m² to 151 m². Each apartment includes at least 1 parking space.
The finishes include underfloor heating with heat pump or similar system, contemporary aesthetics, hot water system supported by aerothermal energy, electric blinds, and PVC windows with thermal break and triple glazing.
Expected completion year: 2026